Skip to text Skip to main menu

Smoke Control System T.A.B Committee

Introduction of the Smoke
Control System T.A.B /
Hydraulic Calculations Committee

We conduct a thorough review of design documents in accordance with the T.A.B. procedures.
This process involves collaborating with key participants to optimize the design.
We measure installation and operational conditions, including airflow, air velocity, and pressure differentials,
to identify and address any potential issues. Through technical review and the exchange of insights,
we ensure the optimal performance of smoke control systems, ultimately delivering the best possible results.

Definition of T.A.B for Smoke Control System

The term "Testing, Adjusting, and Balancing" (T.A.B) of smoke control systems refers to a specific field within fire protection services. It involves a comprehensive review of all design documents related to the project in accordance with the established T.A.B procedures. This process includes preliminary consultations with relevant parties to optimize the design, installation, and operational status of the system. Additionally, it encompasses the measurement of airflow, wind speed, and pressure differentials to identify and rectify any issues, thereby ensuring the optimal performance of smoke control systems.

Roles & Activities

  • STEP.01
    Sales Strategy and
    Information Sharing
  • STEP.02
    Preliminary Review Report
  • STEP.03
    Implementation
  • STEP.04
    Final Deliverables

Work Overview

  • STEP.01
    System Review
    Examination of airflow distribution
    and design documentation for
    the smoke control system.
  • STEP.02
    Site Verification
    Perform on-site inspection
    to confirm that the installation
    of the smoke control equipment meets
    the specifications outlined
    in the design documents.
  • STEP.03
    Operational Execution
    Verification of blower performance,
    measurement of smoke
    control airflow, measurement of dif
    ferential pressure in auxiliary rooms,
    measurement of smoke barrier air velocity,
    and measurement of closing force.
  • STEP.04
    Final Report
    Improvements and adjustments
    based on measurement outcomes,
    comprehensive report
    preparation/submission.